{"id":26462,"date":"2025-02-09T20:27:38","date_gmt":"2025-02-09T16:27:38","guid":{"rendered":"https:\/\/www.infobatumi.ge\/?p=26462"},"modified":"2025-02-15T21:23:51","modified_gmt":"2025-02-15T17:23:51","slug":"batumis-transportis-modzraobis-cvlileba","status":"publish","type":"post","link":"https:\/\/www.infobatumi.ge\/en\/batumis-transportis-modzraobis-cvlileba\/","title":{"rendered":"Several streets will become two-way, Rustaveli Street will be temporarily closed"},"content":{"rendered":"<p class=\"wp-block-paragraph\">According to the Batumi City Hall, until the end of May 2025, traffic on Rustaveli Street, between Griboedov and Demetre Tavdadebuli Streets, will be temporarily restricted.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In addition, during the mentioned period, two-way traffic will be restored on Ninoshvili, Griboedov and Chavchavadze streets.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">According to the City Hall, this section of Rustaveli Street will be closed starting February 10, which will also result in a change in traffic directions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Accordingly, from the same date, vehicles will be able to drive in both directions on Ninoshvili, Griboedov and Chavchavadze streets.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The temporary closure of Rustaveli Street is related to planned rehabilitation works, which will also affect municipal bus routes.<\/p>","protected":false},"excerpt":{"rendered":"<p>According to the Batumi City Hall, until the end of May 2025, traffic will be temporarily restricted on Rustaveli Street, between Griboedov and Demetre Tavdadebuli Streets. In addition, during the mentioned period, two-way traffic will be restored on Ninoshvili, Griboedov and Chavchavadze Streets. According to the City Hall, this section of Rustaveli Street will be closed from February 10, which will also lead to a change in traffic directions. Accordingly, from the same date, Ninoshvili, Griboedov and Chavchavadze [\u2026]<\/p>","protected":false},"author":1,"featured_media":26463,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[330,334],"tags":[],"class_list":["post-26462","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-required-info","category-other"],"a3_pvc":{"activated":false,"total_views":14,"today_views":0},"_links":{"self":[{"href":"https:\/\/www.infobatumi.ge\/en\/wp-json\/wp\/v2\/posts\/26462","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.infobatumi.ge\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.infobatumi.ge\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.infobatumi.ge\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.infobatumi.ge\/en\/wp-json\/wp\/v2\/comments?post=26462"}],"version-history":[{"count":5,"href":"https:\/\/www.infobatumi.ge\/en\/wp-json\/wp\/v2\/posts\/26462\/revisions"}],"predecessor-version":[{"id":26599,"href":"https:\/\/www.infobatumi.ge\/en\/wp-json\/wp\/v2\/posts\/26462\/revisions\/26599"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.infobatumi.ge\/en\/wp-json\/wp\/v2\/media\/26463"}],"wp:attachment":[{"href":"https:\/\/www.infobatumi.ge\/en\/wp-json\/wp\/v2\/media?parent=26462"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.infobatumi.ge\/en\/wp-json\/wp\/v2\/categories?post=26462"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.infobatumi.ge\/en\/wp-json\/wp\/v2\/tags?post=26462"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}